Terms of reference Business development of 46 women-owned microbusinesses
(“Eligibility criteria updated on October 15th”)
1. Context
The Kvinna till Kvinna Foundation is a Swedish non-profit organization dedicated to empowering women in conflict-affected areas by enhancing their power and influence. The foundation's approach emphasizes strong local ownership and long-term support.
Currently, Kvinna till Kvinna Foundation Rwanda is implementing a GIZ-funded women's economic empowerment project titled “Advancing Women’s Inclusion in Business.” This initiative aims to strengthen women's economic participation in Rwanda, focusing on improving working conditions for female employees in the private sector and enhancing the competitiveness of women-led small and medium enterprises (SMEs).
A key outcome of the project is to enhance the competitiveness of women-led microbusinesses. To achieve this, Kvinna till Kvinna will collaborate with five women-led civil society organizations (WCSOs) across Ten districts, targeting 46 groups of women with varying levels of existing business activities.
The five partner WCSOs are:
- OurSister Opportunities (OSO)
- RwandaWomen’s Network (RWN)
- ImpanuroGirls Initiative (IGI)
- FamilyCircle Love Labs Organization (FCLLO)
- Associationof Kigali Women in Sports (AKWOS)
The 46 groups were selected in coordination with the WCSOs and local authorities, primarily based on vulnerability criteria such as poverty, disability, HIV status, single-headed households, and young motherhood. Many members of these groups are already involved in other Kvinna till Kvinna-funded projects that focus on issues like sexual and gender-based violence prevention and sexual and reproductive health rights.
A comprehensive needs assessment focused on business development was conducted for these groups, involving interviews, site visits, and document reviews to produce detailed reports for each business activity. These reports provide key information, identified growth barriers and opportunities, and offered targeted recommendations for addressing challenges and leveraging opportunities. Based on the findings, training curricula were developed covering five key business topics, including detailed agendas, learning objectives, and teaching strategies. Recommendations for one-on-one business development support for each of the groups were also made.
The 46 groups vary significantly in terms of business maturity and scale. While some have established businesses and cooperatives, others engage in limited or nascent economic activities. Additionally, some savings groups function solely as savings entities without joint economic activities, operating primarily out of necessity or for community support. This diversity posed challenges in designing a training program that would meet all participants' needs. Therefore, the decision was made to focus on groups actively engaged in joint economic activities that can reasonably be classified as “microbusinesses” and that have the highest potential for growth. For simplicity, this target group will be referred to as “microbusinesses” hereafter.
Kvinna till Kvinna is planning a comprehensive capacity-building program for representatives of the 46 microbusinesses. This program will include trainings, one-on-one demand-oriented coaching and assistance, and a centralized business competition in Kigali with small-scale in- kind support as prizes.
The training and support will largely be delivered where the 46 microbusinesses are based:
No |
District |
Sector |
Associated WCSOs |
# of women’s groups / “microbusinesses” |
# of participants |
Training location (see Chapter 5.3) |
1 |
Musanze |
Muhoza |
AKWOS |
3 |
13 |
AKWOS will arrange |
2 |
Musanze |
Gacaca |
RWN |
2 |
13 |
RWN will arrange |
3 |
Rubavu |
Rubavu or Rugerero |
AKWOS and RWN |
4 from AKWOS 1 from RWN |
18 |
AKWOS will arrange |
4 |
Gakenke |
Gakenke |
OSO |
9 from OSO |
20 |
OSO will arrange |
5 |
Gakenke |
Gakenke |
OSO |
7 from OSO |
17 |
OSO will arrange |
6 |
Gasabo |
Nyamirambo |
IGI |
6 from IGI |
19 |
IGI will arrange |
7 |
Rwamagana |
Kigabiro |
RWN |
5 from RWN |
16 |
To be arranged by contractor |
8 |
Bugesera |
Nyamata |
RWN and IGI |
3 from RWN 1 from IGI |
18 |
RWN will arrange |
9 |
Huye |
Huye |
FCLLO and IGI |
2 from FCLLO 3 IGI |
20 |
To be arranged by contractor |
Total |
46 |
154 |
|
The trainings will also be attended by local business development advisors (BDA), who are residents of the local sectors where the microbusinesses are based, and part of a scheme by the Rwanda Development Board (RDB). As BDAs are based locally, BDAs will be present to form support relationships with the microbusinesses in the long-term. Including them in the trainings, will support sustaining the work started.
BDAs will also support the microbusinesses apply to the business competition, which will be judged by an impartial panel. The panel will evaluate proposals on a set of pre-defined criteria and award the best business plan developed during the implementation of this project.
2. Tasks to be performed by the contractor
2.1. Term
Period of assignment: 12 months (expected from 15.12.2024 until 15.12.2025)
2.2 Objectives, indicators, work packages, milestones
The contractor is responsible for achieving the objectives described in this document. The contractor will be responsible for achieving the following indicator:
- 23 out of 46 supported microbusinesses demonstrate improved
Marketability is considered improved when a microbusiness confirms one of the following events with a specific example (Examples mentioned by the companies during the surveys are qualitatively analyzed to ensure that a notable improvement has been achieved):
- Employees/membersbetter qualified for their tasks and responsibilities
- Moreefficient supply chain management
- Participationin SME purchasing/sales cooperatives to create economies of scale
- Productinnovation/product diversification
- Productor sustainability certification
- Appliedfor financing
- Newcustomer inquiries
The goal of the assignment is to strengthen the capacities of the 46 microbusinesses through trainings and one-on-one assistance of their representatives and prepare them for active participation in a business competition, where they may win requested equipment, materials, technical support, or other services for their further development.
The contractor will implement the following work packages:
- Implementationof trainings
- Implementationof demand-oriented one-on-one support
- Technicalsupport of business competition
Work package 1: Implementation of trainings
The contractor is responsible for:
- Reviewing the results of the needs assessment of the 46 microbusinesses, including microbusinessesprofiles, developed training curricula for the five topics of interest, as well as recommendations for coaching for each microbusiness.
- Creation/adaption of interactive and informative training materials for the five recommended trainings topics, including presentations, take-home handouts for participants,homework assignments, and interactive materials (e.g. case studies, group exercises, homework assignments, etc.), to enhance understanding and practical application.
- Creationand implementation of pre- and post-knowledge tests for participants for each topic.
- Printingtraining handouts for
Implementingtrainings in Kinyarwanda language for 9 groups of participants in different districts on the following five topics:
Module 1: The business model canvas and business planning Module 2: Financial literacy (covering savings and sources of finance)
Module 3: Financial management (record keeping, simple statements, inventory management)
Module 4: Sales and marketing (seeking, satisfying, and managing customer relationships, pricing, customer management, sales contracts)
Module 5: Doing business in Rwanda (business registration options, taxation and legal obligations, product certification)
- Ensuringeach topic is covered over a period of two full (9 training groups x 5 topics x 2 training days per topic = total of 90 training days).
- Implementingthe trainings in the locations where the 9 groups of participants are
- Coordinating and agreeing on scheduling together with Kvinna till Kvinna’s partnered WCSOs.Where preferred, trainings should be scheduled on non-consecutive days to allow the target group sufficient time for absorption and allow them to balance their
- Arrangingfacilities and conference packages for the trainings for some locations (see Chapter 5.3 for details)
- Documentationof training days (delivery of signed participants lists as well as 1-2 high quality photos per training days)
- Trainingfor participants must be provided in
The contractor should plan for a maximum of 80 roundtrips to perform the trainings for the 8 groups outside of Kigali:
Destination |
Number of groups (outside Kigali) |
Roundtrips |
Travel days |
Training days |
Overnights |
Per diems (for travel and training days) |
Rubavu and Huye |
2 |
20 |
1 day per roundtrip (total of 20 days) |
1 day per roundtrip (total of 20 days) |
2 nights per roundtrip (total of 40 nights) |
2 per diems per roundtrip (total of 40 per diems) |
Musanze, Gakenke, Bugesera, Rwamagana |
8 |
80 |
0.5 day per roundtrip (total of 40 days) |
1 day per roundtrip (total of 80 days) |
1 night per roundtrip (total of 80 nights) |
1.5 per diems per roundtrip (total of 120 per diems) |
Total |
10 |
100 |
60 |
100 |
120 |
160 |
Work package 2: Implementation of demand-oriented one-on-one support
Based on recommendations in the needs assessment, interests/demands of the microbusinesses, and observations of the contractor during trainings, the contractor is responsible for:
- Coordinatingrequests of microbusinesses for one-on-one support and matching needs of the microbusinesses with the most relevant experts.
- Deliveryof demand-based, one-on-one coaching, concrete assistance and technical inputs/works for the 46 microbusinesses. This includes, but is not limited to,
the following services tailored to each business's needs:
- Supportingthe application of training content
- Supportingdevelopment and refinement of business plans
- Supportingaddressing of identified gaps and challenges in the businesses
- Facilitationof market linkages for the microbusiness
- Accompanyingmeetings to loan officers/suppliers/buyers
- Accompanyingnetworking events
- One-on-onetraining sessions on specific topics
- Supporting the development of branding and marketing materials (e.g. translatingideas of the microbusinesses to marketing materials, posters, logos, etc.)
- Supportingthe development of marketing strategies
- Settingup accounts on digital platforms (e.g. social media, e-commerce sites) and supporting content creation (e.g. photography support)
- Supportingmarket research and identifying buyers
- Deliveryof adjusted templates for record keeping and financial planning
- Identificationof financing providers that meet the needs and capacity of the business
- Supportingimprovements in client relationship management (e.g. supporting set up of customer feedback loops)
- Consultingon possible investments and technical capacity building needs for business improvement (e.g. product diversification or quality improvements)
- Deliveryof simple financial models
- Supportingthe development of legal documents for registration (e.g. cooperative founding documents)
- Supportingorganizational development (e.g. organizational charts, process maps, etc.)
- Supportingactions for legal and regulatory compliance
- Advisingon options to contribute to social security
- Supportingthe setup of an efficient inventory management system
- Researchon product certification requirements
- Matching with mentors
- Assisting grant and loan proposal writing and development of required documentation(e.g. for the business competition organized by Kvinna till Kvinna)
Other services
- The support will be delivered in-person or remotely, depending on needs and demandsof the (46 microbusinesses x approx. 10 support days per microbusiness = up to 460 days)
- Clearlydocumenting support given by each coach to each microbusinesses receiving the support services (monthly coaching reports, from start of coaching offer).
- Coachingfor microbusinesses must be provided in
- On-siteone-on-one coaching will be provided on the premises of the microbusiness or the associated WCSO.
The contractor should plan for a maximum of 96 roundtrips for on-site support to the 40 microbusinesses outside of Kigali:
Destination |
Number of microbusinesses (outside of Kigali) |
Roundtrips |
Travel days |
On-site coaching and support days |
Overnights |
Per diems (for travel and training days) |
Musanze |
5 |
12 |
0.5 per roundtrip (total of 6 days) |
3 per roundtrip (total of 36 days) |
4 per roundtrip (total of 48 nights) |
3.5 per roundtrip (total of 42) |
Rubavu |
5 |
12 |
1 per roundtrip (total of 12 days) |
3 per roundtrip (total of 36 days) |
4 per roundtrip (total of 48 nights) |
4 per roundtrip (total of 48) |
Gakenke |
16 |
38 |
0.5 per roundtrip (total of 19 days) |
3 per roundtrip (total of 114 days) |
4 per roundtrip (total of 152 nights) |
3.5 per roundtrip (total of 133) |
Rwamagana |
5 |
12 |
0.5 per roundtrip (total of 6 days) |
3 per roundtrip (total of 36 days) |
4 per roundtrip (total of 48 nights) |
3.5 per roundtrip (total of 42) |
Bugesera |
4 |
10 |
0.5 per roundtrip (total of 5 days) |
3 per roundtrip (total of 30 days) |
4 per roundtrip (total of 40 nights) |
3.5 per roundtrip (total of 35) |
Huye |
5 |
12 |
1 per roundtrip (total of 12 days) |
3 per roundtrip (total of 36 days) |
4 per roundtrip (total of 48 nights) |
4 per roundtrip (total of 48) |
Total |
40 |
96 |
60 |
288 |
384 |
348 |
Work package 3: Support of business competition
After reviewing Kvinna till Kvinna’s business competition concept and criteria, the contractor’s team leader will be responsible for:
- Designinga detailed proposal template, which microbusinesses must use for the competition (in English and Kinyarwanda).
- Advising on the development of detailed selection criteria for evaluating microbusinessesproposals and creating an evaluation sheet, based on Kvinna till Kvinna’s concept.
- Assessing microbusinesses proposals as a member of the impartial selection panel, which includes participating in a multi-day conference in Kigali where microbusinesses present their proposals, asking questions after presentations, advisingKvinna till Kvinna on the selection of winners, and completing the evaluation
Main milestones/deliverables |
Deadline |
Kickoff meeting with Kvinna till Kvinna. |
1 week upon contract signature / estimate: 22.12.2024 |
Operational plan presented and agreed with Kvinna till Kvinna. |
1 month upon contract signature / estimate: 15.01.2024 |
Delivery of training materials, including participant handouts, for each training topic. |
2 months upon contract signature / estimate: 15.02.2024 |
Progress report 1 submitted. |
4 months upon contract signature / estimate: 15.04.2024 |
Delivery of trainings completed. |
6 months upon contract signature / estimate: 15.06.2025 |
Progress report 2 submitted. |
8 months upon contract signature / estimate: 15.08.2025 |
Delivery of support to business competition completed. |
8 months upon contract signature / estimate: 15.08.2025 |
Delivery of coaching and support completed (monthly coaching and support reports). |
9 months upon contract signature / estimate: 15.09.2025 |
Final report submitted. |
11 months upon contract signature / estimate: 15.11.2025 |
2.3 Project and knowledge management requirements
Requirements on the assignment of experts:
- The contractor is responsible for selecting, preparing, training and steering the experts assigned to carry out the advisory services.
Requirements on equipment and operating costs:
- The contractor makes the required equipment and consumables available and covers their operating and administrative costs.
Requirements on expenditure management and cost control:
- The contractor managescosts and expenditures, accounting processes and invoicing in line with Kvinna till Kvinna requirements.
Monitoring and reporting requirements:
Kvinna till Kvinna will provide Monitoring & Evaluation personnel to track the achievement of the indicator for which the contractor is responsible (including creation of relevant questionnaires, data collection and input, and data processing).
The contractor plays an active role in the results-based monitoring of the project. Regular monitoring activities must cover at least the following areas:
- Degree to which activities are implemented
- Degree to which the objectives and milestones listed in Chapter 2 of these ToRs have been achieved
Results that have occurred in the contractor’s sphere of responsibility The contractor submits the following reports outlined in Chapter 2.2:
- Progress reports on the implementation status of the work packages after 4 and 8 months of implementation
- Monthlycoaching and support reports on one-on-one coaching and support given to the microbusinesses, from start to end of coaching offer
- A final report the degree of achievement of the results indicators (up to ten pages at the end of the assignment)
Back stopping requirements:
The contractor ensures appropriate backstopping. The following services form part of the standard backstopping package. These services – as well as the ancillary personnel costs – must be priced into the fee schedules of the staff listed in the tender:
- Thecontractor’s responsibility for its own staff;
- Ensuring the flow of information between Kvinna till Kvinna and the contractor’s field staff;
- Process-orientedtechnical and conceptual steering of the consulting services;
- Steeringadaptations to changing framework conditions;
- Performancemonitoring;
- Ensuringthe administrative management of the project;
- Ensuringcompliance with reporting requirements;
- Technicalsupport by the contractor’s staff for its personnel on the ground;
- Making local useof and sharing the lessons learned by the contractor with the Kvinna till Kvinna team.
2.4 Other requirements
Safeguards and gender measures with specific reference to services:
In order to promote gender equality and avoid or mitigate possible unintended negative impacts in its area of responsibility, the contractor should implement the following measures:
Genderequality: Prevent negative impacts on gender equality in its area of responsibility
3. Technical-methodological concept
The tenderer is required to reflect on the objectives and terms of reference of the tender at hand and present a technical-methodological concept:
3.1 Interpretation of objectives (section 1.1 of the assessment grid)
The tenderer is required to interpret the objectives for which it is responsible. Simple repetition of the objectives formulated in Chapter 2 of the ToRs is not desired. Rather, the contractor is to describe and interpret the changes in the partner system that are to be directly achieved by the object of the tender procedure. The resulting positive impact on the partner system (section 1.1.1 of the assessment grid) should also be presented.
The contractor must undertake a critical examination of the ToRs (section 1.1.2 of the assessment grid), for example by:
- undertakingan assessment of the appropriateness of the personnel concept for implementing the scheduled tasks;
- providingan assessment of the results hypotheses for achieving the objectives and possible risks in implementation;
- makingan assessment of the technical concept
3.2 Strategy (section 1.2 of the assessment grid)
The strategy for delivering the services in the tender is the core element of the technical- methodological concept. It is composed of the following elements:
- Procedurefor achieving the objectives stated in Chapter 2 of these ToRs
- Developmentof partnerships with the relevant actors
- Approachesfor leverage effects and measures for scaling-up
- Considerationof environmental and social compatibility requirements (including gender equality)
- Appropriateconsideration of further requirements
3.3.1 Strategic approach to achieving the objectives mentioned in the ToRs
(section 1.2.1 of the assessment grid)
The tenderer is required to describe and justify the approach it plans to adopt in order to achieve the milestones, objectives and results (see Chapter 2 of this ToR) for which it is responsible.
3.3.2 Building partnerships with the relevant actors
(section 1.2.2 of the assessment grid)
The tenderer is required to develop and describe a strategy for developing the cooperation with the actors in the partner system who are relevant for the implementation of the services in the tender. The project partnerships already mentioned in section 1 must also be taken into account.
3.3 Project management
(section 1.3 of the assessment grid)
In this section, the tenderer presents the operational plan for implementing the services in the tender, describes the procedure for coordination with Kvinna till Kvinna and the project partners, and explains its backstopping strategy and the monitoring procedure.
3.4.1 Operational plan
(section 1.3.1 of the assessment grid)
The tenderer is required to draw up and explain an operational plan for implementing the strategy, including a plan for the assignment of all the experts included in the tender. The operational plan must include the assignment times (periods and expert days) and assignment locations of the individual experts, the milestones as presented in Chapter 2 and, in particular, describe all the necessary work stages in detail and in chronological order. The tenderer must define further milestones beyond those prescribed in Chapter 2 and map them out in the plan of operations.
3.4.2 Coordination with Kvinna till Kvinna
(section 1.3.2 of the assessment grid)
In the tender, the tenderer is required to describe the procedure for coordinating with Kvinna till Kvinna.
3.4.3 Steering or coordination of measures with the relevant implementing partner
(section 1.3.3 of the assessment grid)
In the tender, the tenderer is required to name the implementing partners relevant for implementing the services and to describe and explain the procedure for steering or coordinating the measures with them.
3.4.4 Monitoring
(section 1.3.4 of the assessment grid)
In the tender, the tenderer is required to describe how it will regularly capture and document the status of completion of the tasks, the achievement of objectives, the results achieved and the risks in the area for which it is responsible in accordance with the specifications set out in Chapter 2.
4. Human Resources
The tenderer is required to provide ‘experts’ for the positions referred to and described in this Chapter on the basis of corresponding CVs. The requirements on the format and content of the CVs are described in Chapter 6.
When selecting personnel, the contractor must ensure that the team is well-balanced with respect to gender.
The qualifications mentioned below correspond to the requirements for achieving the highest number of points in the technical assessment.
‘One year of professional experience’ is therefore defined as a cumulative 12 expert months with at least 20 expert days per month.
Expert 1: Team leader
Tasks of Expert 1: Team leader
- Overallresponsibility for the quality and deadlines of work packages of the contractor
- Implementationof work package 3
- Coordinatingand ensuring communication with Kvinna till Kvinna, WCSOs, and others involved in the project
- Personnel management, in particular identifying the need for short-term assignments withinthe available budget, as well as planning and steering assignments and supporting short-term experts
- Regularreporting in accordance with deadlines Qualifications of Expert 1: Team leader
Expert 2: Pool with minimum 2, maximum 3 members (“Business planning experts”)
Please send a CV for each pool member for the assessment. The tenderer must provide a clear overview of all proposed short-term experts and their individual qualifications.
For the technical assessment, an average of the qualifications of all specified members of the expert pool is calculated.
Tasks of Expert 2: Pool (“Business planning experts”)
- Implementationof module 1 trainings
- Implementationof coaching on topics related to module 1 Qualifications of Expert 2: Pool (“Business planning experts”)
Expert 3: Pool with minimum 3, maximum 5 members (“Financial literacy & management experts”)
Please send a CV for each pool member for the assessment. The tenderer must provide a clear overview of all proposed short-term experts and their individual qualifications.
For the technical assessment, an average of the qualifications of all specified members of the expert pool is calculated.
Tasks of Expert 3: Pool (“Financial literacy & management experts”)
- Implementationof module 2 and 3 trainings
- Implementation of coaching on topics related to module 2 and 3 Qualificationsof Expert 3: Pool (“Financial literacy & management experts”)
|
in Rwanda (Note: 3/10 points awarded in assessment of 2.3.4 if fulfilled fully) Of all experts,
|
Expert 4: Pool with minimum 2, maximum 3 members (“Sales & marketing experts”)
Please send a CV for each pool member for the assessment. The tenderer must provide a clear overview of all proposed short-term experts and their individual qualifications.
For the technical assessment, an average of the qualifications of all specified members of the expert pool is calculated.
Tasks of Expert 4: Pool (“Sales & marketing experts”)
- Implementationof module 4 trainings
- Implementationof coaching on topics related to module 4 Qualifications of Expert 4: Pool (“Sales & marketing experts”)
|
sites), including content creation support. (Note: 5/10 points awarded in assessment of 2.4.4 if fulfilled fully) |
Expert 5: Pool with minimum 2, maximum 3 members (“Business regulations experts”)
Please send a CV for each pool member for the assessment. The tenderer must provide a clear overview of all proposed short-term experts and their individual qualifications.
For the technical assessment, an average of the qualifications of all specified members of the expert pool is calculated.
Tasks Expert 5: Pool (“Business regulations experts”)
- Implementationof module 5 training
- Implementation of coaching on topics related to module 5 Qualificationsof Expert 5: Pool (“Business regulations experts”)
The tenderer must assign all the proposed experts to the required qualifications and clearly present them in a separate table preceding the CVs. The summary presentation must mention only qualifications that are actually indicated in the CVs. Professional experience must be evidenced by meaningful references in the CVs. It is advisable to make explicit reference to each example of professional experience.
Soft skills of team members
In addition to their specialist qualifications, all team members are also expected to have the following qualifications:
- Teamskills
- Initiative
- Communicationskills
- Socioculturaland intercultural skills
- Efficientpartner- and client-oriented working methods
- Interdisciplinarythinking Soft skills are not evaluated.
5. Costing requirements
In your tender, please do not deviate from the specification of quantities required in these ToRs (the number of experts and expert days, the budget specified in the price schedule). This is part of the competitive tender and is used to ensure that the tenders can be compared objectively. Please note: only services that were commissioned by Kvinna till Kvinna and rendered by the contractor will be remunerated. We would also like to point out that it may not be necessary to make use of the total number of proposed expert days.
5.1 Assignment of experts
The number of expert days corresponds to full working days (1 expert day = 8 hours of work).
Fee days |
Number of experts |
Number of days per expert |
Total |
Comments |
Expert 1: Team leader |
1 |
Up to 50 |
Up to 50 |
|
Expert 2: Pool (“Business planning experts”) |
Min. 2, max. 3 experts |
N/A |
Up to 137 |
|
Expert 3: Pool (“Financial literacy & management experts”) |
Min. 3, max. 5 experts |
N/A |
Up to 274 |
Work package 1: 10 days training preparation + 36 days for implementation of trainings (module 2 and 3) + 20 travel days to travel to businesses outside of Kigali |
|
|
|
|
Work package 2: 184 coaching days + 24 travel days to travel to businesses outside of Kigali |
Expert 4: Pool (“Sales & marketing experts”) |
Min. 2, max. 3 experts |
N/A |
Up to 137 |
|
Expert 5: Pool (“Business regulations experts”) |
Min. 2, max. 3 experts |
N/A |
Up to 137 |
|
Note on travel days:
- Round trip travel time from Kigali to Musanze or Gakenke or Rwamagana or Bugesera will be compensated with max. 0.5 days per roundtrip.
- Round trip Travel time from Kigali to Rubavu or Huye will be compensated with 1 days per roundtrip.
5.2 Travel expenses
The specified lump sums (per-diem, accommodation, transport) are the amounts to be entered into the price schedule by the tenderer. Higher lump sums must not be included in the tender.
Travel expense item |
Number/quantity |
Lump sum up to |
Comments |
Per diem allowances (Travel outside of Kigali) |
478 days |
25.000 RWF / Total of 11.950.000 RWF |
|
Accommodation allowances (Travel outside of Kigali) |
504 nights |
50.000 RWF / Total of 25.200.000 RWF |
|
Transport costs (taxi, car, local public transport, outside of Kigali) |
176 roundtrips from Kigali to other cities |
30.000 RWF / Total of 5.280.000 RWF |
|
All business travel must be agreed in advance by Kvinna till Kvinna. Travel expenses must be kept as low as possible.
5.3 Workshops and trainings
Work shop budget: 19.222.000 RWF
The fixed, unalterable budget above is earmarked for workshop costs and entered in the price schedule. The budget includes the following costs relating to the planning and running of workshops:
- Full-dayconference packages (venue, refreshments, technical systems hire) for the trainees only in Huye and Rwamagana
- Printingcosts for training handouts
- Notebooksand stationery for trainees (unless already covered by the WCSOs or conference packages).
- Othercosts relating to the workshops, not already separately covered by Kvinna till Kvinna or the WCSOs
The budget does not include the following costs, because they are covered by Kvinna till Kvinna or the WCSOs:
WCSOs will provide the following during the trainings, as separate budgets are provided for this:
- Childcarefor the trainees
- Conferencepackages (venue, refreshments, notebooks and stationery, technical systems hire) for the trainees in all locations except Huye and Rwamagana
- Signlanguage interpretation for deaf participants
Kvinna till Kvinna will cover all workshop costs related to the business competition (work package 3).
The budget does not include the fees and travel expenses for the contractor’s experts incurred in connection with the planning and running of the workshops. These are covered by the corresponding number of expert days and travel expenses (see sections 5.1 and 5.2 above).
6. Requirements on the format of the tender
6.1 Technical tender
The structure of the tender must correspond with the structure of the ToRs. It must be legible (for example Arial, font size 11 or larger) and clearly formulated. The tender must be written in English.
The technical-methodological concept of the tender (Chapter 3 of the ToRs) must not exceed 10 pages (not including the cover page, list of abbreviations, table of contents, brief introduction). Additional annexes not requested will not be assessed.
The CVs of the staff proposed in accordance with Chapter Error! Reference source not found. of the ToRs must not be more than four pages in length. The CVs must be submitted in English.
The CVs must clearly and unequivocally show what position the proposed person held, which tasks they performed and how long they worked during which period in the specified references. The references contained in the CVs must therefore include the following information:
- Name of the company/organisation/reference project in which the expert worked
- Position held and task(s) performed by the expert in the company/organisation/reference project
- Work outcomes or products produced by the expert, or expert’s contribution to the completion of these outcomes and projects (if relevant)
- Duration of the expert’s assignment in the company/organisation/reference project per calendar year in full-time expert days, weeks or months (for example: 2019: 2 months, 2020: 10 months, 2021: 1 month)
- Leadership experience/management: clear information on the reference projects or fixedpositions within the company/organisation in which the requirements specified in section 4 were fulfilled (for example, period, number of persons for whom the expert had disciplinary responsibility, project budget) (if relevant)
In order to facilitate the assessment, we request that you number the references sequentially and provide only references that are clearly related to the object of this tender.
6.2 Financial tender
Please calculate your financial tender based exactly on the parameters specified in Chapter 5 and the provided financial offer template.
The contractor is not contractually entitled to use up the days, trips, workshops or budgets in full. The number of days, travels and workshops and the budgets will be contractually agreed as maximum limits. The specifications for pricing are defined in the financial proposal template.
Submission of Tenders
Interested candidates should submit tenders to Kvinna till Kvinna no later than 14th November by email to esperance.umulisa@kvinnatillkvinna.se
Contact
For questions, please contact annette.natukunda.mukiga@kvinnatillkvinna.se