Tender Reference No: 139 /WB/02/2025-2026
Tender method: Open
March 30th,2026
Dear Sir/Madam,
REQUEST FOR PROPOSAL (RFP) FOR SUPPLY OF KITCHEN ITEMS FOR RWANDAIR
RwandAir is fast national carrier of the republic of Rwanda, which has expanded its fleet operation beyond Africa to respond to customer needs and expectations.
RwandAir is inviting eligible suppliers to submit quotations forSupply of Kitchen Items forRwandAir as detailed below;
Item description with specifications
|
S/N |
Item Description |
Qty |
Unit Price (RWF) |
|
1 |
Standard Tea Cups (Luminac) Color: White Size : 32cl |
1 |
|
|
2 |
Standard Dinner Ware Plates (Luminac) Extra resistant Color: White Size:27cm |
1 |
|
|
3 |
Stainless Table spoons |
1 |
|
|
4 |
Stainless Tea Spoons |
1 |
|
|
5 |
Stainless Forks |
1 |
|
|
6 |
Coffee makers. Adjustable warming plate, brew strength control, 24-hour programmability. |
1 |
|
|
7 |
Kitchen water jugs Glass 1.5 L |
1 |
|
|
8 |
Stainless Flasks 1L |
1 |
|
|
9 |
Stainless Flasks 5L |
1 |
|
|
10 |
Stainless Steel Electric Kettles Power: 1500–2200 W (fast boiling). |
1 |
|
|
11 |
Household Moping Rugs. Size 40 × 12 cm. washable, absorbent |
1 |
|
|
12 |
Coffee Filters Paper: white or brown Single-use, fine filtration. |
1 |
|
|
13 |
Trays Stainless steel (durable, hygienic, heat-resistant) or Plastic (polypropylene, melamine, lightweight). |
t |
|
|
14 |
Water dispenser with four options, warm, Hot , Cold and fridge |
1 |
|
|
15 |
Standard Fridge with two compartments. Power Consumption 100 to 800 Kwh per year. |
1 |
|
|
16 |
Microwave: Type: Grill Microwave Oven Capacity: 31 L Microwave Power: 1000 W Grill Power: 1100 W (Quartz heaters ×2) Combination Cooking: Yes (microwave + grill simultaneously) Control Panel: Membrane keypad, LCD display |
1 |
|
|
17 |
Sugar bowels (porcelain) Material: High-quality porcelain Capacity: Usually ranges from 200 ml to 500 ml (enough for household sugar serving). Dimensions: Height: 8–12 cm Diameter: 7–10 cm Weight: Light (200–400 g depending on size). |
1 |
|
|
18 |
Bread Toaster, Standard porcelain sugar bowls are simple, practical, and affordable. |
1 |
|
|
19 |
Bar chairs: Frame: Metal (steel, aluminum)or plastic. Seat: plastic or steel Aluminum |
1 |
|
|
20 |
Water Heater: Capacity Small: 10–15 L (point-of-use, kitchens, bathrooms). Medium: 25–50 L (family use). Large: 80–200 L (whole-house systems). Power Source Electric: Heating element (1–3 kW). Gas: Burner with thermostat, requires ventilation. Solar-assisted: Panels + storage tank. Water Heater: Capacity Small: 10–15 L (point-of-use, kitchens, bathrooms). Medium: 25–50 L (family use). Large: 80–200 L (whole-house systems). Power Source Electric: Heating element (1–3 kW). Gas: Burner with thermostat, requires ventilation. Solar-assisted: Panels + storage tank. Voltage (Electric Models) 220–240 V / 50–60 Hz (household standard). Heating Time 10–15 L: ~10–15 minutes. 50 L: ~30–40 minutes. 100 L+: ~1 hour. Temperature Range Adjustable thermostat: 40°C – 75°C. Safety cut-off at ~90°C. Material Inner tank: Stainless steel or glass-lined steel. Outer body: Powder-coated steel or ABS plastic. Insulation: Polyurethane foam for heat retention. Safety Features Thermostat with auto cut-off. Pressure relief valve. Dry heating protection. Anti-corrosion coating. Mounting Options Vertical wall-mounted (common). Horizontal wall-mounted (space-saving). Floor-standing (large capacity). |
1 |
|
|
21 |
Small cloth : all colors Microfiber (high absorbency, quick-drying, dust-trapping). |
1 |
|
|
22 |
Paper Towels Standard sheet: ~22 × 24 cm. Roll length: 20–60 m depending on brand. Industrial rolls: up to 200 |
1 |
|
|
23 |
Plastic Baskets small: from 15–25 cm diameter and 10–15 cm height. Rectangular: ~20 × 15 × 10 cm. Round: ~18 cm diameter × 12 cm height. Household small baskets: 1–3 kg. |
1 |
|
|
24 |
Plastic Buskets big size plastic: Household storage: 20–40 liters. Laundry baskets: 40–60 liters. |
1 |
|
|
25 |
Cooker Oven Medium: 60–80 L (standard family use). |
1 |
|
|
26 |
Everyday drinking glasses. Juice, water, soda, cocktails. Hospitality and catering settings. Size: 310ml.
Everyday drinking glasses Size: 280ml. |
1 |
|
|
27 |
Padlocks small Size: Body width: 20–30 mm. Shackle diameter: 3–5 mm. Shackle clearance: 10–15 mm |
1 |
|
|
28 |
Padlocks Big size Body width: 50–90 mm. Shackle diameter: 8–12 mm. |
1 |
|
|
29 |
Soap dish Plastic (lightweight, affordable, water-resistant). |
1 |
|
|
30 |
Size : 1L
Size: 5L
Size: 20L. |
1 |
|
|
31 |
Wood handle Broom (standard household). Plastic Handle Broom (Standard Household) Handle length: 90–120 cm |
1 |
|
|
32 |
Kitchen heat resistance Microwave gloves Size:29cmx14cm |
1 |
|
|
Long size household gloves silicone Size 35x20cm |
1 |
||
|
33 |
Latex Gloves large 9 to 10 inches |
1 |
|
|
34 |
Dust bins big plastic Size: 120L |
1 |
|
|
35 |
Dust bins small metallic |
1 |
|
|
36 |
Dust bins small plastic Size: 60 litters |
1 |
|
|
37 |
Dust bins small plastic with pedal Size: 240 litters |
1 |
|
|
38 |
Dust bins big size with pedal Size: 660 L |
1 |
|
|
39 |
Knives stainless steel Small knives: 7–10 cm Medium knives: 15–20 cm Large knives: 20–30 cm |
1 |
|
|
40 |
Cutting boards Small: 20 × 15 cm (snack prep, garnishes). Medium: 30 × 20 cm (general kitchen use) Large: 45 × 30 cm (meat, bread, professional prep). |
1 |
|
|
Taxes |
Inclusive |
||
|
The following documents must be submitted alongside the bid.
Terms and Conditions
Detailed Terms and Conditions |
|
|
Eligible Suppliers
This criterion shall also apply to the proposed subcontractors or suppliers for any part of the Contract including Related Services.
|
|
|
Eligible Goods and Related Services
|
|
|
Request for Clarifications Any Supplier may request in writing to the procuring entity via company email procurement@rwandair.com for clarifications on this request for quotation. The Procuring Entity shall respond to any request for clarification within two working (2) days from the day of its reception. The Procuring Entity shall communicate and forward, without disclosing the source of the request for clarification, to all suppliers the copies of the clarifications that were given in response to the request by the Procuring Entity. |
|
|
Modification to the Request for quotation
|
|
|
Language of Quotation. The Quotation, as well as all correspondence and documents relating to the Quotation exchanged by the Suppliers and the Purchaser, shall be written in English language or French. |
|
|
Quotation Prices and Discounts
|
|
|
Currencies of the Quotation
|
|
|
Documents Establishing the Conformity of the Goods and Related Services
Delivery time |
|
|
Suppliers are required state in their quotations delivery time that will be consider when placing orders. If this is not done, it will be assumed that the Suppliers has accepted to go by the delivery time specified in the RFQ document by the procuring entity, that is within 4 weeks. |
|
|
Quotation Validity Period
|
|
|
Deadline for Submission of Quotations
|
|
|
Late Quotations The Procuring Entity shall not consider any Quotation that arrives after the deadline for submission of Quotations. Any Quotation received by the Procuring Entity after the deadline for submission of Quotations shall be declared late, rejected, and returned unopened to the bidder. If submission was done via email, the late Quotations shall be rejected and not considered for opening and the evaluation. The Quotation shall be communicated by email that the Quotation was sent late and will not be considered. |
|
|
Confidentiality
|
|
|
Clarification of Quotations To assist in the examination, evaluation, comparison and post-qualification of the Quotations, the Procuring Entity may, at its discretion, ask any supplier for a clarification of its Quotation. Any clarification submitted by a supplier in respect to its Quotation and that is not in response to a request by the Procuring Entity shall not be considered. The Procuring Entity’s request for clarification and the response shall be in writing an email. No change in the prices or substance of the Quotation shall be sought, offered, or permitted, except to confirm the correction of arithmetic errors discovered by the Procuring Entity in the Evaluation of the Quotations. At his/her own initiative, a Supplier may provide clarifications on his/her Quotation but which shall not change its price or substance. |
|
|
Responsiveness of Quotations
|
|
|
Non conformities, Errors, and Omissions
|
|
|
Examination of Terms and Conditions; Technical Evaluation The Procuring Entity shall examine the Quotation to confirm that the Supplier without any material deviation or reservation has accepted all terms and conditions as specified in the RFQ document. |
|
|
Conversion to Single Currency. For evaluation and comparison purposes, the Procuring Entity shall convert all Quotation prices expressed in amounts in various currencies into an amount in a single currency (RWF), using the selling exchange rates established by the ‘’BNR’’ and on the date of Quotations submission specified in the RFQ document. |
|
|
Domestic Preference.
|
|
|
|
|
Procuring Entity Has Right to accept any quotation, and to reject any or all quotations The Procuring Entity reserves the right to accept or reject any Quotation, and to annul the tendering process and reject all Quotations at any time prior to contract award, without thereby incurring any liability to the Suppliers that submitted their quotation. |
|
|
Award Criteria The Procuring Entity shall award the Contract to the Supplier whose Quotation has been determined to be the lowest evaluated Quotation and is substantially responsive to the RFQ Documents, provided further that the Supplier is determined to be qualified to perform the Contract satisfactorily. |
|
|
Procuring Entity’s Right to Vary Quantities at Time of Award At the time the tender is awarded, the Procuring Entity reserves the right to increase or decrease the quantity of Goods and Related Services originally specified in the List of Requirements, provided this does not exceed the percentages 5%, and without any change in the unit prices or other terms and conditions of the Quotation and the RFQ Documents. Notification of Award
The Purchase Order shall base on the RFQ document, the successful Quotation, any clarification received and accepted, and any correction made and negotiations agreement between the Procuring Entity and the successful Supplier. |
|
|
25. Payment terms 25.1. The Supplier’s request for payment shall be made to the Procuring Entity in writing, accompanied by invoices describing, as appropriate, the Goods delivered and Related Services performed. 25.2. Payments shall be made promptly by the procuring entity, but in no case later than thirty (30) days after submission of an invoice or request for payment by the Supplier, and after the Procuring Entity has accepted it. 25.3. The currencies in which payments shall be made to the Supplier shall be those in which the Quotation price is expressed. However, Companies registered in Rwanda or those owned by Rwandan nationals shall only be paid in Rwanda currency and shall be made after supply, installation, commissioning and final acceptance of supplies. 25.4 Payment shall be fully made after delivery. However, if there are circumstances that necessitate advance payment, an advance payment Bank guarantee of the same amount shall be required in order to make the advance payment.
|
END