TERMS OF REFERENCE

SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF LED FLOODLIGHTING FOR THREE TENNIS COURTS AND ASSOCIATED ELECTRICAL DISTRIBUTION WORKS

ELECTRICAL WORKS AND LIGHTING

FÉDÉRATION RWANDAISE DE TENNIS
Kigali, Rwanda

2026

1. Introduction

FEDERATION RWANDAISE DE TENNIS(FRT) intends to improve the usability of the tennis courts at IPRC-Kicukiro through the installation of LED floodlighting serving three (3) tennis courts and the associated electrical distribution infrastructure. The works shall be undertaken in accordance with the requirements set out in these Terms of Reference and the accompanying Bills of Quantities (BOQs).

The Contractor shall be responsible for the supply, installation, testing, commissioning and handover of the specified systems, including all necessary accessories, connections, civil works, labour, tools and equipment required for a complete and operational installation.

2. Selection Criteria

Interested bidders shall submit a technical proposal demonstrating their understanding of the assignment and their capacity to supply and install the LED floodlighting and electrical distribution systems. The proposal shall be technically compliant with the specifications and quantities in the BOQs.

The proposed solution shall be reliable, safe, suitable for the intended tennis court use and economically viable. Bidders shall inspect the site and take account of the existing conditions, electrical supply, connected loads and routing of cables.

3. Submittals

  • Company profile and valid business registration documents.
  • Valid tax clearance and VAT registration certificate, as applicable.
  • Evidence of experience in the supply and installation of sports lighting, electrical distribution or comparable electrical installations, supported by completion certificates or client references.
  • Technical proposal describing the proposed execution methodology for the LED floodlighting system serving three (3) tennis courts and the associated electrical distribution works.
  • Technical datasheets and manufacturer information for the LED projectors, poles, cables, distribution boards, protection devices and other major equipment.
  • Proposed layout drawings showing floodlight pole positions, cable routes and electrical distribution arrangements, for approval before installation.
  • Priced Bills of Quantities showing unit rates, quantities and total cost, with applicable taxes clearly indicated.
  • Project implementation schedule, including procurement, delivery, installation, testing and commissioning activities.
  • Quality assurance, occupational health and safety, and environmental protection measures.
  • List of proposed key technical personnel, with CVs, qualifications and relevant experience.
  • Manufacturer or supplier authorization, where applicable, and warranty information for the supplied equipment.
  • Evidence of financial and logistical capacity to execute and complete the assignment.

4. Key Technical Staff

The bidder shall propose qualified and experienced personnel appropriate to the nature and scale of the works. The proposed team shall include, at a minimum:

  • Project Manager: responsible for overall coordination, program, quality and delivery of the assignment.
  • Electrical Engineer/Technician: experienced in electrical distribution, protection, cabling, lighting installations, testing and commissioning.
  • Civil Works Supervisor/Engineer: responsible for foundations, pole bases, supports, reinstatement and associated civil works.

Bidders shall provide CVs and copies of relevant academic/professional qualifications and evidence of experience for the proposed personnel.

5. Project Objectives

  • Provide suitable LED floodlighting for three (3) tennis courts to support safe and effective use during evening periods.
  • Provide safe, reliable and properly protected electrical distribution infrastructure for the facilities and connected lighting loads.
  • Improve the reliability, operational efficiency and usability of the tennis court facilities.
  • Ensure that the installed systems are safe, maintainable and supported by appropriate operating instructions and warranties.

6. Scope of Works of Successful Bidder

6.1. General requirements

  • Visit and verify the site conditions, dimensions, access routes, available electrical supply and cable routing before commencing the works.
  • Prepare and submit detailed installation drawings and equipment data for the Employer’s review and approval.
  • Supply all materials, equipment, accessories, labour, tools, transport and installation services required for complete and functional systems.
  • Coordinate the works with the Employer and the facility management team to minimize disruption to the use of the courts.
  • Protect existing facilities and reinstate any surfaces or areas disturbed during the works.

6.2. LED floodlighting for three (3) tennis courts

The Contractor shall supply and install the floodlighting system in accordance with the floodlighting BOQ. The specified principal components include:

  • High-efficiency outdoor LED sports floodlights/projectors, 530 W, approximately 78,980 lumens, 149 lm/W, 4000 K, IP66 and IK08 or the stated equivalent specification; 16 units.
  • Eight (8) galvanized steel poles/towers, including foundations, base plates, anchor bolts and accessories.
  • Power and control cables, including 4 x 6 mm² and 4 x 2.5 mm² cables in the quantities stated in the BOQ.
  • One distribution cabinet, 800 x 1000 x 200 mm; eight junction boxes, 100 x 100 x 70 mm.
  • One 100 A main MCCB, three 32 A sub-MCCBs, sixteen 16 A MCBs, three timer switches, three single-phase contactor and two-way switch arrangements, and one three-phase 63 A changeover switch.
  • Civil works for pole foundations and bases, together with erection, alignment, electrical cabling, terminations and connections.

The Contractor shall ensure that the floodlights are securely mounted, correctly aimed and connected to the distribution and control equipment. The final aiming and switching arrangements shall be demonstrated to the Employer.

6.3. Electrical distribution and associated electrical works

The Contractor shall supply, install, test and commission the electrical distribution infrastructure and associated works required to provide safe and reliable power distribution for the facilities. The works shall be coordinated with the floodlighting installation and shall include the following items, as detailed in the electrical BOQ:

  • One (1) main complete distribution board fitted with a 250 A MCCB, 250 A busbar and all necessary accessories.
  • Six (6) sub-distribution boards, each fitted with a 125 A MCCB, 63 A MCBs and other required circuit breakers and accessories.
  • Supply and installation of 1¼-inch PN10 PVC pipes, including fittings, accessories and Tangit glue, for the specified cable containment/routing works.
  • Supply, laying, termination and testing of the specified power cables: 4-core × 35 mm² (12 units/lengths), 4-core × 16 mm² (670 units/lengths) and 4-core × 10 mm² (120 units/lengths). Final cable routes and actual measured lengths shall be verified on site and confirmed in the approved BOQ and shop drawings before installation.
  • Provision and installation of twelve (12) items described in the supplier quotation as “Manholes”. The precise technical description, rating, location and unit of measurement shall be clarified and approved by the Employer before procurement or execution.
  • All required electrical accessories, connectors, glands, lugs, cable supports, labels, earthing/bonding materials and other minor materials necessary for a complete and safe installation.
  • Associated construction/civil works, including openings, supports, mounting arrangements, cable trenches or containment works where required, and reinstatement of affected surfaces.
  • Provision of qualified electrical manpower, supervision, tools, testing instruments, transport and other resources required to complete the works.

The Contractor shall inspect the existing electrical installation and verify the incoming supply capacity, distribution arrangement, load requirements, cable routes and installation conditions before commencing work. The Contractor shall submit single-line diagrams, distribution board schedules, cable-sizing calculations, protection coordination details, earthing arrangements and installation/shop drawings for the Employer’s approval.

All distribution boards and protective devices shall be appropriately rated for the connected loads and prospective fault levels. Circuits shall be properly identified and labelled. Cable sizing, installation methods, voltage drop, short-circuit protection, earthing and bonding shall comply with applicable Rwanda requirements and recognized IEC or equivalent standards. No connection to an existing live installation shall be made without prior authorization and an approved isolation/safety procedure.

The Contractor shall ensure that the electrical distribution works are properly integrated with the floodlighting system. Any interface, capacity or scope conflict identified during the site inspection shall be reported to the Employer for written direction before the affected work proceeds.

6.4. Testing and commissioning

  • Test electrical continuity, insulation resistance, polarity, earthing and bonding, phase sequence, protective devices, control circuits, switching arrangements, distribution boards and all installed power cables.
  • Conduct functional tests of the installed floodlights and demonstrate the operation of the control and timer arrangements.
  • Carry out functional checks of the main and sub-distribution boards and protective devices, and rectify defects identified during inspection, testing and commissioning at no additional cost to the Employer.

7. Handover

  • Submit operation and maintenance manuals for the floodlighting and electrical distribution systems.
  • Provide equipment datasheets, electrical single-line diagrams, distribution board schedules, cable schedules, wiring/control diagrams, test certificates, as-built drawings and warranty certificates.
  • Provide practical training to the Employer’s designated facility operation and maintenance staff.
  • Demonstrate the complete operation of the systems and hand over all keys, accessories and control settings.

8. Performance Requirements

  • The floodlighting installation shall cover the three (3) designated tennis courts using the 16 LED projectors and eight (8) galvanized poles specified in the BOQ.
  • All electrical equipment, including the main and sub-distribution boards, circuit breakers, cables and accessories, shall be correctly rated, protected, securely installed, properly labelled and suitable for the intended operating environment.
  • All systems shall be fully operational, safe and maintainable at the time of handover.

9. Quality Standards

  • All materials and equipment shall be new, unused and from reputable manufacturers.
  • Equipment shall comply with the specifications in the BOQs and relevant applicable IEC, ISO or equivalent standards.
  • Outdoor lighting equipment shall meet the stated IP66 and IK08 protection ratings or approved equivalent specifications.
  • Electrical installation, earthing, cabling and protection shall comply with applicable Rwanda requirements and recognized electrical safety standards.
  • Workmanship shall be of good professional quality and comply with applicable national construction and occupational safety requirements.

10. Program and Timeline

Bidders shall submit a realistic implementation schedule covering site verification, submission of drawings, procurement and delivery of materials, civil works, installation, testing, commissioning and handover. The proposed schedule shall clearly indicate the duration and sequence of each activity. The final implementation period shall be agreed with the Employer and stated in the contract.

11. Deliverables

  • Approved installation/shop drawings and technical datasheets.
  • Complete LED floodlighting system installed and operational for three (3) tennis courts, together with the associated electrical distribution works.
  • Completed civil works, foundations, pole erection, electrical distribution boards, cable containment, cabling, terminations, connections and reinstatement.
  • Testing and commissioning reports for the floodlighting and electrical distribution installations.
  • As-built drawings, operation and maintenance manuals, warranties and equipment documentation.
  • Training of designated facility operation and maintenance staff.
  • Final completion and handover report.

12. Contractor Obligations

  • Provide qualified personnel, adequate tools, equipment and supervision to complete the works.
  • Supply materials and equipment in accordance with the approved technical specifications and BOQs.
  • Ensure proper storage, handling and protection of materials and existing facilities.
  • Comply with applicable environmental, occupational health and safety requirements and provide appropriate personal protective equipment.
  • Maintain site records and submit progress reports as required by the Employer.
  • Obtain approval before making any changes to the approved materials, layout or installation arrangements.
  • Verify all electrical quantities, cable lengths, ratings and the description of the “Manholes” item during the mandatory site visit; obtain the Employer’s written clarification/approval before pricing or executing any unclear item.
  • Correct defects arising during installation, testing and the applicable defects liability period.
  • Provide warranties for supplied equipment and workmanship. The proposed warranty/defects liability period shall be clearly stated in the bid.

13. Employer’s Obligations

  • Provide access to the IPRC-Kicukiro site and facilitate coordination with the facility management team.
  • Provide available information on existing electrical connection points and supply arrangements, where applicable.
  • Review submitted drawings, technical information and work plans within a reasonable period.
  • Facilitate inspection and acceptance of completed works and process payments in accordance with the contract.

14. Governance and Oversight

  • FEDERATION RWANDAISE DE TENNIS( FRT) or its designated representative shall oversee implementation of the assignment.
  • The Contractor shall coordinate regularly with the Employer and the facility management team.
  • Site inspections shall be carried out at agreed stages, including before concealment of cable works, after pole foundation works and during testing and commissioning.
  • Final acceptance shall be subject to satisfactory completion, testing, commissioning and submission of the required handover documents.

15. Bid Submission

Bids shall be submitted through the following email/address:info1@rwandatennis.rw

The deadline for bid submission is set 9th /12/2026 at12:00PM.

The technical proposal and financial proposal shall be clearly presented. The financial proposal shall include a priced BOQ, applicable taxes and the total cost for the complete assignment.

16. Site Visit

Bidders are required to visit IPRC-Kicukiro before submitting their bids to inspect the three (3) tennis courts intended for floodlighting and the areas intended for electrical distribution works. The visit shall enable bidders to assess site conditions, electrical supply, access, installation routes and any other factors that may affect execution.

Bidders shall coordinate with FEDERATION RWANDAISE DE TENNIS(FRT) to arrange the visit and include proof of attendance with their bids. The site visit is scheduled from the 26th/11/2026 to the 2nd/12/2026 at RP KIGALI COLLEGE TENNIS FACILITY

17. Bid Evaluation Criteria

Bids shall first be checked for timely submission, completeness of required documents, eligibility and compliance with the mandatory requirements in these Terms of Reference. Bids that fail mandatory requirements may be rejected, subject to applicable procurement rules.

The evaluation shall be conducted in two stages:

Stage 1 – Technical evaluation (80 points):

  • Relevant company experience in the supply and installation of sports lighting, electrical distribution or comparable installations, supported by completion certificates or client references – 10 points.
  • Technical compliance and quality of the proposed floodlighting and electrical equipment, including datasheets, specifications, suitability and conformity with the BOQs – 25 points.
  • Installation methodology and understanding of the assignment, including cable routing, distribution arrangements, pole foundations and floodlight installation – 20 points.
  • Implementation schedule, quality assurance, testing and commissioning plan, occupational health and safety and environmental management – 10 points.
  • Qualifications and relevant experience of the proposed key technical staff – 10 points.
  • Financial and logistical capacity, including ability to procure, deliver and mobilise the required materials and equipment – 5 points.

Bidders must achieve at least 70% of the available technical points (56 out of 80) to proceed to financial evaluation.

Stage 2 – Financial evaluation (20 points):

The financial proposal of each technically qualified bidder shall be evaluated for completeness, arithmetic accuracy, compliance with the BOQs and overall cost, including applicable taxes. The lowest evaluated responsive financial offer shall receive 20 points. Other offers shall receive proportionately fewer points using the formula:

Financial score = (lowest evaluated responsive price ÷ bidder’s evaluated price) × 20

Final ranking: The technical and financial scores shall be added to obtain a total score out of 100. The highest-ranked bidder whose bid is responsive and who meets the eligibility and qualification requirements shall be recommended for award, subject to applicable procurement rules.

Click on the APPLY button to send your application documents:
  • Your application will be sent to the employer immediately (Allowed formats: .doc .pdf .txt .docx)
  • A confirmation email will be sent to you few minutes afterwards
  • You can request any documents archived from our website (ex: a job description, a CV, a cover letter...)